IC4

From Wikipedia, the free encyclopedia

IC4
IC4
DSB's IC4 test train in Aarhus.
Power type diesel
Builder Ansaldo Breda, Finmeccanica
Build date since 2005
Total production IC4: 1 (83 ordered)[1]
Length 86 m
Total weight 160 t
Top speed 200 km/h
Power output 2,240 kW
Safety systems ATC

The IC4 is an inter-city train built by Italian Ansaldo Breda for the Danish State Railways’ cross-Great Belt routes. Set to replace several types of outdated rolling stock as part of the company’s ‘good trains for everybody’ plan, the project has become a major political issue because of several delays. The IC4 units were originally planned to enter service by 2003, but as of January 2007, the train still has not been used in revenue service.

Contents

The train is powered by four low-emission diesel engines with ‘common rail’ direct injection system, for a total power of 2240 kW, giving the train a top speed of 200 km/h (124 mph). Each trainset consists of four articulated cars with a total length of 86 meters (282 feet), and is able to seat 208 people. Built of light aluminium alloys, each trainset weighs 140 tons, and up to four trainsets can be coupled in one train.

The trains design is a result of cooperation between DSB’s own designers, stressing Nordic minimalistic design, and the Italian design company Pininfarina, famous for designing Ferrari cars, stressing Italian sexyness and curves. On the exterior, the sharp noses on the end of each trainset, known from high speed trains throughout Europe, represents a break with the current tradition of the IC3 train, where passengers are able walk between the trainsets. In the interior, the train features natural materials in line with Scandinavian design tradition, an audio/video information system with seat reservation displays, and a lounge area.

The train has become a hot potato in Danish politics, mainly because of the long delay in delivery from Ansaldo Breda. The Danish minister of Traffic and Energy is routinely required to give the parliament updates on the progress, and DSB’s choice of a heavily-customised train is often criticised as the major source of the delays. The expense involved in lengthening platforms on several stations along the route of the IC4 is the source of much additional criticism. In recent news [1], it was revealed that the trains appear to be working properly, but documentation demands from safety authorities prevent the train from beginning full operation.

  1. ^ IC4 kører som en drøm (dr.dk)
Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.